Choose language: English | Tiếng Việt
Download documents
Documents are in PDF format. Click link to download. Click link to download Adobe Acrobat Reader to read PDF file.
Catalogue Vinh Hung ISO 9001:2008

Vinh Thinh Bridge Project

Project: Vinh Thinh Bridge Project

Total Investment (Billion VND): 2.323

Employer: Thang Long Project Management Unit

Customer/Contractor: Mechanical Construction Company No.1 (MCC1), Bridge Enterprise 18 – Cienco 1, Bridge Enterprise 17 – Cienco 1

Supplied product: PC strand, Anchorage

Time: 2012 - 2013

Longest bridge over Red River

Vinh Thinh Bridge will come up on National Highway No 2C, in ring road No 5, linking Sơn Tây Township, Ha Noi with Vinh Tuong District, Vinh Phuc Province.

The four-lane bridge, with the length of 5,478 m-the longest one over the Red River, is designed with reinforced concrete and prestressed reinforced concrete.

The project, expected to come into operation after 36-month construction, has total investment capital of US $137 million, including US $100 million sourced from the Republic of Korea’s ODA loan.

Once completed, Vinh Thinh Bridge will connect with Highway Noi Bai - Lao Cai Cai, Ho Chi Minh to form an integrated transport system connecting Ha Noi with the Northwestern provinces of Vinh Phuc, Phu Tho, Lao Cai, Yen Bai, Tuyen Quang.

< Back..