Choose language: English | Tiếng Việt
Download documents
Documents are in PDF format. Click link to download. Click link to download Adobe Acrobat Reader to read PDF file.
Catalogue Vinh Hung ISO 9001:2008

Gia Rai bridge – Bac Lieu province

Project: Gia Rai bridge – Bac Lieu province

Total Investment (Billion VND): 469

Employer: Bac Lieu Department of Transportation

Customer/Contractor: Transportation Engineering No.499 Company

Supplied product: Bridge Bearing

Time: 2013

Gia Rai bridge project starts building

On February 15, 2012, the Bac Lieu People’s Committee organized a building ceremony of Gia Rai bridge project in Gia Rai district, Bac Lieu province.

 

At the ceremony, with the attendance of the Minister of Transport Dinh La Thang, Secretary of the Bac Lieu Provincial Party Committee Vo Van Dung, Chairman of the Bac Lieu People’s Committee Pham Hoang Be along with the provincial-level leaders from departments, boards, branches and the leaders from Gia Rai and Dong Hai districts.

The leaders are on the building ceremony.
                                                                                                            Photo: www.baclieu.gov.vn

The main investor of this project is by Bac Lieu Transport Department, the construction company is the Civil Engineering Construction Corporation No.4 (Cienco 4) belonging to the Ministry of Transport. This project is considered the life-line of provincial road No 980 and Ho Phong-Ganh Hao route because it connects from National Highway1A to the coastal economic zone in Ganh Hao seaport and town of Dong Hai district. Beside, it is also the Ho Chi Minh route in order to connect from National Highway 63 to Quan lo-Phung hiep road, from Western Sea to Eastern Sea route across Ganh Hao seaport with the shortest distance.

Gia rai bridge is the biggest and longest one in Bac Lieu province, with a overall length of 4.883,8m; of which its main length of 654,8m and the length of two sides of 4.229m, maximum speed of 80 kilometers an hour, allowing maximum weight of 12 ton, investment capital VND 469 billion, it is expected to be completed this project within 18 months.

After finishing this project, it will reduce obstructive traffic in Gia rai bridge, to connect straight route between Ganh Hao-Gia Rai-Pho Sinh with Ho Phong-Ganh Hao line, to orient development Gia Rai urban and town, Ganh Hao economic zone in the future.

Chairman of the Bac Lieu People's Committee Pham Hoang Be at the ceremony.
                                                                                                            Photo: www.baclieu.gov.vn

Mr. Pham Hoang Be, Chairman of  the Bac Lieu People’s Committee asked Transport Department, Project management board, Design consultation units, Supervision consultant units and Buildingcontractors need managing and building works according to the best quality of standards and ensuring highly aesthetic . Simultaneously, they must speed up the rate of progress and overcome a difficulty to try completing the project according to a plan or earlier completion, to make sure absolutely safety and environmental sanitation during building time.

The Minister of Transport Dinh La Thang speaks at the ceremony.
                                                                                                           Photo: www.baclieu.gov.vn

On the same day, the Minister of Transport Dinh La Thang said the Ministry of Transport and the Bac Lieu province will carry out important transport projects in the coming time, so the province should be more interested in transportation infrastructure construction to develop socio-economic field.

He also suggested that the Civil Engineering Construction Corporation No.4 must be ensure its safety, quality and ontime regulation. The province should encourage local people to transfer the clearance for construction company so that ensuring execution program of works

< Back..