Total Investment (Billion VND): 8.770

Employer: Railway Project Management Unit (RPMU)

Customer/Contractor: China Railway Sixth Group Co., Ltd

Supplied product: Thread bar, PC strand

Time: 2013

Urban railway project Cat Linh - Ha Dong with the total investment of nearly 8770 billion (equivalent to over U.S. $ 550 million). In particular, preferential credit loans to China's 1.2 billion yuan ($ 169 million), $ 250 million in concessional loans and domestic reciprocal 2123 billion.

The entire project is longer than 13 km, overhead and mainly on the median between the two lanes of the road Hao Nam and Nguyen Trai. The starting point is the station Cat Spirit (Dong Da District), the end in Yen Nghia station (Ha Dong), include 12 stations and depot in Phu Luong (Ha Dong).

User urban railway Cat Linh - Ha Dong (Source: Vietbando / GAFIN)


Unit EPC Company Limited China Railway Bureau Group 6. The contractor has completed construction 11 Dong Da pier on the lake and Hoang Cau, initiated the piers on Hao Nam Street, completing career in the Depot ...

It is expected that the project will be completed in June / 2015.

 

Urban railway project Cat Linh - Ha Dong with the total investment of nearly 8770 billion (equivalent to over U.S. $ 550 million). In particular, preferential credit loans to China's 1.2 billion yuan ($ 169 million), $ 250 million in concessional loans and domestic reciprocal 2123 billion.

The entire project is longer than 13 km, overhead and mainly on the median between the two lanes of the road Hao Nam and Nguyen Trai. The starting point is the station Cat Spirit (Dong Da District), the end in Yen Nghia station (Ha Dong), include 12 stations and depot in Phu Luong (Ha Dong).

User urban railway Cat Linh - Ha Dong (Source: Vietbando / GAFIN)

Unit EPC Company Limited China Railway Bureau Group 6. The contractor has completed construction 11 Dong Da pier on the lake and Hoang Cau, initiated the piers on Hao Nam Street, completing career in the Depot ...

It is expected that the project will be completed in June / 2015. - See more at: http://mrb.gov.vn/en/investment-project/start-railway-high-cat-linh-ha-dong#sthash.FVkHTbQ6.dpuf